ODISHA GENERATION PHASE II TRANSMISSION LIMITED (OGPTL)

/

Flipped

evacuating and distributing power in the eastern region

A special purpose vehicle incorporated for providing grid connectivity in Odisha

All Projects

/

ODISHA GENERATION PHASE II TRANSMISSION LIMITED (OGPTL)

/

Flipped

evacuating and distributing power in the eastern region

A special purpose vehicle incorporated for providing grid connectivity in Odisha

All Projects

ODISHA GENERATION PHASE II TRANSMISSION LIMITED (OGPTL)

Flipped

evacuating and distributing power in the eastern region

A special purpose vehicle incorporated for providing grid connectivity in Odisha

Project snapshot

Project Name

Odisha Generation Phase II Transmission Limited (OGPTL)

Project Location

Odisha, Chhattisgarh

Commissioned Date

Apr 2019

Total Power Evacuation

1320 MW

Transmission length

715 cKM

Transmission Line

765 kV DC

Project snapshot

Project Name

Odisha Generation Phase II Transmission Limited (OGPTL)

Project Location

Odisha, Chhattisgarh

Commissioned Date

Apr 2019

Total Power Evacuation

1320 MW

Transmission length

715 cKM

Transmission Line

765 kV DC

Project snapshot

Project Name

Odisha Generation Phase II Transmission Limited (OGPTL)

Project Location

Odisha, Chhattisgarh

Commissioned Date

Apr 2019

Total Power Evacuation

1320 MW

Transmission length

715 cKM

Transmission Line

765 kV DC

OGPTL was incorporated on April 17, 2015. OGPTL entered into a TSA on November 20, 2015. The OGPTL project was awarded by the Ministry of Power on January 6, 2016 for a 35-year period from the scheduled commercial operation date of the OGPTL project, on a BOOM basis.

The Jharsuguda-OPGC 400kV D/C transmission line was commissioned in August 2017 and Raipur- Jharsuguda line was commissioned in April, 2019.